Start construction of bridge and road from Go Gang to Long Son on May 19
-   +   A-   A+     11/05/2009

On May 05, Mr. Tran Ngoc Thoi - Vice Chairman of the provincial People"s Committee chaired the meeting on preparation of bridge and road from Go Gang to Long Son (Vungtau City) and construction works for this project reported by the Department of the Transport.

On May 05, Mr. Tran Ngoc Thoi - Vice Chairman of the provincial People"s Committee chaired the meeting on preparation of bridge and road from Go Gang to Long Son (Vungtau City) and construction works for this project reported by the Department of the Transport.

According to Director of the Department of Transport Vu Ngoc Thao, so far, the investment preparation, contractor selection have been completed. The investor has completed the items of water, electricity supply to serve construction; mine, bomb detection and disposal on the entire construction site; leveling ground of construction site...

After listening to the report of the Department of Transport, Mr. Tran Ngoc Thoi conducted the Department of Transport in collaboration with the People"s Committee of Vungtau City to solve matters on site to handover to the contractor. May 19 is selected to start construction of bridge and road from Go Gang island to Long Son to celebrate the birthday anniversary of President Ho Chi Minh. Entrust the Department of Planning and Investment to resolve quickly the records related to the project.

The project has the total invested capital of VND850 billion. As per the engineering, the road has 4.926m length, 40m width connecting from Go Gang bridge to Cha Va bridge. Cha Va bridge has permanently pre-stressed, reinforced concrete structure of length of 1.152m, width of 13.5 m, including 17 spans of bridge.

Trieu Vy


Read count: 9706 Previous page Back to top
Other news