A new study by Spanish researchers investigates the importance of emotions in software-engineering requirements. Led by scientists from the Universidad Carlos III de Madrid, the study focused on how emotions shape a software development project’s requirements. Because software is designed and developed by humans, the researchers say emotions do drive the process, including the various acceptance and negotiation activities that take place during the development process. “In the world of computer system development consultants, I have often met disappointed users whose unhappiness was produced by a deficient collection of requirements,” stated Ricardo Colomo, one of the study’s authors. The researchers used a social-psychology tool called an affect grid to overlay a project’s requirements. They found that developers must take user’s emotions into account when negotiating and establishing software-development requirements, even when there are different stakes or emotional expectations for users compared to those held by the development team. Researchers from the Universidad Complutense de Madrid and the Universidad de Murcia also collaborated on the study, the results of which appeared in the Journal of Universal Computer Science. (EurekAlert)(Journal of Universal Computer Science)
Researchers Analyze Emotions in Software Engineering Requirements
A new study by Spanish researchers investigates the importance of emotions in software-engineering requirements. Led by scientists from the Universidad Carlos III de Madrid, the study focused on how emotions shape a software development project’s requirements. Because software is designed and developed by humans, the researchers say emotions do drive the process, including the various acceptance and negotiation activities that take place during the development process.
Source:
computer.org
Read count:
4256
Previous page
Back to top
Other news
- Vietnam’s anti-virus software used worldwide (24/04/2008)
- Short-term training courses on radiation and nuclear safety in industry (18/04/2008)
- Acceptance of sciencentific research : “Develop GIS for urban management in Vung Tau City in BR-VT” (18/04/2008)
- Wireless ReachImproves Access to Education Tools (17/04/2008)
- Leaders of the PPC worked with the DOST (16/04/2008)
- The Review Meeting of the Ordinance on Radiation Safety and Control was held in Ha Noi (16/04/2008)
- Vietnam secures 10 grades up in global IT report (16/04/2008)
- Network Security: A Persistent Problem (02/04/2008)
- Checking the project progress: "Scaling up the model of electronic information serving for BR – VT socio-economic development" (02/04/2008)
- Workshop approved project: Do survey and select longan (Nhan xuong) in BR–VT (31/03/2008)